Post by Bob on Apr 7, 2005 21:55:21 GMT -5
just saw this document for architecural services for e9
The City will be contracting with an architectural firm for the preparation of design and construction documents for the fire station 9 project. The offeror shall provide all, civil engineering, landscape design, structural engineering, and interior design, required for the completion of the project, as well as coordination with a mechanical engineer assigned by the City.
|
|
|
Post by Aerialscope75 on Apr 13, 2005 22:47:33 GMT -5
Are They Building a New Facility? If So Where Will It Be Located?
|
|
|
Post by Box_2565 on Apr 14, 2005 14:38:52 GMT -5
The new station will be located on the west side of Reading Road south of Avon Drive where the Sugar and Spice restaurant is located. I'm not sure if the restaurant is going to be torn down or if the land to the south of that site is where the new house will be.
Hopefully things will start moving along for the new quarters for the 8's too!
|
|
|
Post by district5 on Apr 17, 2005 12:27:42 GMT -5
The Cincinnati Enquirer April 17, 2005
NORTH AVONDALE
Engine 9 fire station to move
The city of Cincinnati plans to spend about $1.5 million to move the North Avondale fire station. Engine Company 9, which has served the neighborhood from a fire station at Reading and Paddock roads since 1929, will soon move to a new station half a mile up Reading Road to a spot north of Victory Parkway. Engine 9 was the home of Oscar Armstrong III, who died in 2003 battling a fire in Bond Hill. The city is requesting design proposals.
|
|
|
Post by Box_2565 on Sept 9, 2005 19:49:01 GMT -5
The new firehouse will be built on the land that is between Sugar & Spice and the bank to the south. Ground breaking will reportedly be in January of 2006.
|
|
|
Post by Bob on May 12, 2006 13:36:42 GMT -5
the city is in the process of rebidding for the construction of the 9s new station, i guess that the other builder and the city couldnt workout thier differences
|
|
|
Post by district5 on Sept 15, 2006 16:38:35 GMT -5
On Tuesday, September 19, 2006, the City of Cincinnati and the Cincinnati Fire Department will hold a groundbreaking ceremony for our new fire station, which will be located at 4379 Reading Road. The ceremony will take place at 10:30 AM. It would be great if you could be in attendance at our event, your presence would add to the event. By the new fire station replaces the current Engine 9, which was built in 1929. The new station will be a two-story structure with a total square footage of 15,555 square feet. The new station will house Engine 9, Squad 9 and Ambulance 9. Two features that are unique to the new station are that it will have its kitchen and conference room on its second floor, the only station in the City with such design.
FYI, the following are the Fire Department's Parking arrangements: The Fire Department will provide a shuttle service for the ceremony. The shuttle will pick up individuals that are parked in the following parking lots: Upper parking lot for Avon Fields Golf Course, 4081 Reading Road The O.N.G. Armory Parking Lot, 4130 Reading Road
The shuttle will run continuously from 0930 hours until 1030 hours. It will then run continuously for one hour, along the same route, at the conclusion of the ceremony.
|
|
|
Post by Box_2565 on Dec 22, 2006 1:44:45 GMT -5
Things are moving along with the new station. I went by there yesterday and the outer walls are up for most of the building giving a good idea of how the station will look. I was surprised at how the building is situated on the lot as I thought the front of the station would be farther back from Reading Road. I posted a picture of the current construction on the 9's page.
Steve
|
|
|
Post by yfdgricker on Apr 6, 2007 15:13:41 GMT -5
Word has it that construction on the new station will be completed in September. There is a recent photo of the house on the 9's page and the building is really coming along. You can get a good idea of the final shape that the station will be
|
|
|
Post by Box_2565 on Nov 7, 2007 16:01:04 GMT -5
O.K. - If the copper plumbing survives then I've heard that November 20th is the date that the 9's will be in service at the new house. Apparently some items have been moved from the current station to the new place.
Also I've been told the dedication ceremony is scheduled for November 15th at 10:00 a.m.
Steve
I've changed this!! The date is Thursday the 15th!
|
|
|
Post by box1352 on Nov 9, 2007 15:43:36 GMT -5
Any pictures of the new firehouse?
|
|
|
Post by Box_2565 on Nov 11, 2007 14:52:26 GMT -5
Hi,
I just received an e-mail that indicates that the dedication has been POSTPONED, No new date was given.
There are a couple of photos of the new station on the page for Engine 9.
Steve
|
|
|
Post by mbecknell on Dec 11, 2007 19:39:37 GMT -5
any one know if the guys who work at company nine have moved in the new house
|
|
|
Post by Box_2565 on Dec 31, 2007 19:00:09 GMT -5
Hi,
I'm curious too. Anyone know when the expected date for the move to the new house is?
Steve
|
|
|
Post by sender78 on Jan 21, 2008 16:01:11 GMT -5
Does anybody know if or when the 9's house might be finished, I have heard there are problems with the floors. But do they have a plan to fix it.
|
|